Do you have any 
questions for us?

Customer service

24/7

During the BIXI season, from April 15 to November 15

During the off-season : Monday to Friday, 8 a.m. to 4 p.m. 


BIXI Montréal

5945 de Gaspé avenue
Montréal (Québec) H2S 2X4
Canada


Email: info@bixi.com

Customer service: 514-789-BIXI (2494)
Toll free: 1-877-820-2453
Fax: 514-633-5688

Head office: 514-397-8935



An error occurred, try again later.
Your email has been successfully sent!

All fields are required.

Network info

Stay up to date

All network changes are posted daily.

Click here
Retour

Stay up to date

All network changes are posted daily.

Station Map

Network info

2018-06-22
- Cartier / Masson is temporarily removed for work purpose

- Parc Plage station reinstated today.
2018-06-21
- Gauthier / Parthenais station has been removed.
2018-06-20
-

- Roy / St-Hubert station has been removed.
2018-06-15
- du President-Kennedy / Robert Bourassa station is temporarily removed for work purpose
2018-06-13
-

- Peel / avenue des Canadiens de Montréal was installed.
2018-06-12
-

- Cypress / Peel station was installed.

-

- St-Alexandre / Carmichael station has been removed.

-

- Métro Lionel-Groulx (Atwater / Lionel-Groulx) station was installed.
2018-06-11
-

- Metcalfe / de Maisonneuve station was installed.

-

- Quesnel / Vinet station has been removed.
2018-06-08
- Hochelaga / Chapleau station is temporarily removed for work purpose.
2018-06-07
- Metcalfe / de Maisonneuve station is temporarily removed for work purpose.

- 9e avenue / Dandurand station is temporarily removed for work purpose.

- Métro Frontenac (Ontario / du Havre) station has been removed.
2018-06-05
-

- Parthenais / Laurier station was installed.
2018-06-04
-

- Basin / Richmond station has been removed.

-

- Notre-Dame / Chatham station has been removed.

-

- Cypress / Peel station has been removed.
2018-05-31
- Jeanne-Mance / St-Viateur station reinstated today.

- de Marseille / Viau station is moved to the Centre Pierre-Charbonneau

- Louis-Colin / Willowdale station is moved to the intersection of Louis-Colin / McKenna
2018-05-30
-

- de l'Église / Bannantyne station was installed today.

-

- de l'Église / de Verdun station was installed today.
2018-05-29
-

- Peel / avenue des Canadiens de Montréal station has been removed.

-

- Alexandra / Jean-Talon station has been removed.
2018-05-28
-

- de Bleury / Mayor station is moved to the intersection of Maisonneuve /de Bleury.

-

- de Chateaubriand / Beaubien station reinstated today.
2018-05-24
- Metcalfe / du Square Dorchester station is moved to the intersection of de la Cathédrale / René-Lévesque

- Clark / St-Cuthbert station is moved to the intersection St-Cuthbert / St-Urbain
2018-05-23
-

- Parthenais / Laurier station has been removed.
2018-05-22
-

- Duke / Brennan station was installed today.

-

- d'Outremont / Ogilvy station was installed today.

-

- Henri-Julien / du Carmel station was installed today.
2018-05-18
- Metcalfe / Ste-Catherine station is moved to the intersection of Mansfield / René-Lévesque

- Pierre-de-Coubertin / Aird station is moved to the intersection of Pierre-de-Coubertin / Sicard
2018-05-17
- Métro Université de Montréal station reinstated today.

- Jean-Brillant / McKenna station reinstated today.
2018-05-16
-

- St-Alexandre / Ste-Catherine (6081) station was installed today.

-

- St-Marc / Sherbrooke station was installed today.

- Ontario / Clark station is moved to the intersection of Ste-Catherine / Clark
2018-05-15
-

- Station Fullum / Sherbrooke station was installed today.
2018-05-14
-

- Jeanne-Mance / St-Viateur station has been removed.

-

- Laurier / 15e avenue station is temporarily closed for work purpose.

-

- St-Antoine / St-François-Xavier station installed today.

-

- St-Nicolas / Place d'Youville station installed today.

-

- Wurtele / Ontario station is moved to the intersection of Wurtele / de Rouen
2018-05-11
- Boyer / Beaubien station reinstated today

- Métro Lucien-L'Allier (Lucien l'Allier / Argyle) station has been removed.

- Mackay / René-Lévesque station has been removed.
2018-05-10
- St-Dominique / Gounod station reinstated today.

- St-Antoine / St-François-Xavier station is temporarily removed for work purpose.
2018-05-09
-

- Métro Berri-UQAM (St-Denis / de Maisonneuve) station reinstalled today.

-

- St-Urbain / Beaubien station is temporarily closed for work purpose.

- Eadie / Dubois station reinstated today.

- Square Sir-Georges-Étienne-Cartier / St-Ambroise station reinstated today.
2018-05-08
-

- Jogues / Allard station installed today

-

- de Chateaubriand / Beaubien station has been removed.

-

- Atwater / Ste-Catherine station installed today.
2018-05-07
-

-

- Fullum / Sherbrooke station has been removed.
Retour